Sanigad Hydro located along the right bank of the Kalanga River in the Seti zone of the Far-Western Region, the project leverages the river’s flow, partly sustained by snowmelt, making a significant contribution to Nepal’s sustainable energy landscape.

Contact Us

Project

Project location and geography

The Upper Kalanga Gad Hydroelectric Project (UKHEP) is nestled within the picturesque landscapes of Bajhang District, Far Western Nepal. The project area encompasses the boundaries of Dahabagar VDC and Khiratadi VDC. Positioned within the latitude range of 29o34’43’’ N to 29o38’24’’ N and longitude 80o52’30’’E to 80o57’20” E, the project area offers a breathtaking backdrop for sustainable energy endeavors.

The headwork area of UKHEP is proximately located near Girau village, with the powerhouse strategically positioned on the right bank of the Kalanga River near Bijgada village. The project’s geographical context showcases the dynamic topography of the region, ranging from elevations of about 1150 m to 6300 m above mean sea level. The Kalanga Gad River, a major tributary of the Seti (West Seti) River, meanders through the project area, contributing to the region’s rich hydrological potential.

The project’s location within the Lesser Himalayan Zone presents unique challenges and opportunities, with the catchment area characterized by rugged topography and diverse climatic conditions. From snow-covered peaks to verdant valleys, the project area encapsulates the essence of Nepal’s natural beauty while embodying the spirit of sustainable development.

Project Implementation

The contractors for the completion of the project element in the realization of the project are as follow

S.N.Contractor titleContractor
1Civil ConstructionSunam Infrastructure Nirman Private Limited
2Hydro-Mechanical worksSunam Infrastructure Nirman Private Limited
3Electro-Mechanical worksAndritz Hydro Private Limited
4Transmission LineMudhbary and Joshi Construction Private Limited
5Design and construction supervisonAngel Engineering Consultancy Private Limited

Apart from that the company has employed Team of engineers, Technical and non-technical staffs from the early stage of the construction activities. The active participation of the teams especially in the electromechanical installation work and Transmission line installation works has gained the valuable experience for years to come for the operation and maintenance of the project during the generation stage.